Economy

Reconstruction of Kabeli Corridor transmission line accelerates, aims to be operational before tihar

ILAM: Reconstruction efforts for the Kabeli Corridor 132 kV double-circuit transmission line, damaged by floods from the Mai River, are in full swing. The Nepal Electricity Authority (NEA), along with 20 private sector hydropower projects connected to the transmission line, are working jointly to complete the restoration before Tihar....

Pages: 1 20 21 22 23 24 267